H Beam is assembled by two flange and one web plate.
The mutual positional relationship between the web and the flange plate directly affects the qualified rate of the H-beam finished product. The automatic or manual gas shielded spot welding H-beam assembly machine can quickly and accurately locate the position of each plate, which greatly improves the efficiency of H-beam production
Specifications:
Function |
Assembling for H beam flange and web plate |
Model |
Z25 |
Clamping mode |
Hydraulic |
Welding mode |
Gas shield welding |
Web Thickness |
6-80mm |
Web height |
160-2500mm |
Flange thickness |
40mm |
Flange height |
200-800mm |
Suitable beam length |
4000-15000mm |
Machine power |
9.5KW |
Assembly speed |
0.5-6m/min |
Power |
AC380V 50HZ 3P |
Lemar Automatic H beam Assembling machine Features:
1. There are a variety of specifications, according to customer requirements to provide different automatic or manual spot welding H-beam assembly machine
2. The clamping of the wing plate and the web plate adopts hydraulic automatic centering. There are two types of automatic spot welding and manual spot welding. 3. The automatic spot welding adopts a famous brand gas shielded welding machine to ensure the welding strength and welding point requirements.
4. The action control of the spot welding system is controlled by the inverter and the time relay, which is easy to operate, easy to set the time, and has good stability.
5. The automation control is more than double the efficiency of general products.
6. The work is stable and reliable, and the welding torch is equipped with a tracking arc guide device, which can ensure the quality of spot welding.
Scope of supply:
1.Assembling machine *1 set
Main engine including: frame, upper gantry, wing plate, web synchronous clamping and centering system, main drive motor reducer
2.Hydraulic system *1 set
Including pump station, high pressure hose, hydraulic cylinder
3.Electric control part *1 set
Including electrical cabinet and control cable
4.Conveyor roller table*1 set
Including:2600mm*3 input roller table, 2600mm*3 output roller table, 2 sets of tie rod system
5.Gas shielded welding machines*2 sets (if automatic spot welding is required)
6. Technical documents:
Instruction manual, electrical schematic diagram, hydraulic schematic diagram, certificate of conformity
Start-up sequence of H-beam hydraulic automatic centering assembling machine
(1) Wipe the hydraulic station of the H-beam erecting machine clean, install the automatic assembly machine on the level floor, and fill it with oil after cleaning.
(2) Referring to the hydraulic schematic diagram provided by Lemar, connect the oil outlet of the hydraulic station to the two sets of special joints on the main engine according to the corresponding number.
(3) Refer to the electrical schematic diagram provided by Lemar to introduce the control line of the power station and check the power connection.
(4) Loosen the handle of the steel structure flange and web assembling machine relief valve, jog the motor, check the steering, make sure the steering is correct, and the motor turns clockwise.
(5) Start the motor and adjust the relief valve. The working pressure is 6 Mpa. Be careful not to exceed this pressure to eliminate oil leakage from the external pipeline.
(6) Manual electromagnetic reversing valve, check whether the action of the actuator is correct.
(7) Use the electrical debugging cycle to complete the specified work.